AODE · Self-hosted deploy portal
Deploy without
the platform tax.
Install once on any VPS. Push from GitHub, GitLab or Bitbucket. Auto-SSL, PostgreSQL and MySQL, zero-downtime deploys, all in one panel you own.
Features
What is in the panel
AODE is a self-hosted deployment platform for your own Linux VPS. Use it instead of Vercel, Railway or Render. It builds your Git repositories into Docker deployments, routes traffic through Traefik, and issues Let's Encrypt certificates. You pay a one-time license instead of a monthly platform bill.
AI assistant
Ask in plain words: deploy this repo, add a database, why did the build fail. It works through the panel's own API and asks before it runs a command. Runs on your own Claude subscription or API key, and stays off until you turn it on.
Git deploys
GitHub, GitLab (including self-hosted) and Bitbucket. Push to your branch and a webhook starts the deploy.
Zero-downtime deploys
The new version must pass a health check before it replaces the old one. If it fails, the old one keeps serving.
PostgreSQL, MySQL and Redis
One click per project, with connection variables injected into the container. A browser for SQLite and PostgreSQL is built in.
Docker Compose apps
Deploy a multi-service stack from a compose file. Only the web service is exposed, and each stack gets a memory budget.
Database backups
Nightly backups stay on the server, with an optional copy to Cloudflare R2. Restore from the panel.
Persistent volumes
Mount a volume per app so uploads and data survive redeploys.
Automatic SSL
Certificates issue and renew on their own, for the panel and every custom domain.
Builds
AODE uses your repo's Dockerfile when it has one. Otherwise it generates one for 9 languages.
Rollbacks and secrets
Every build is tagged, so you can roll back in one click. Environment variables are encrypted at rest.
Chat alerts
Deploy, rollback, webhook and backup results go to Slack, Discord or Telegram.
Signed updates
Update from the panel. Every release is checked against a signature before anything is installed.
the interface
The panel
Projects, logs, domains and env vars, each one click from the sidebar.
Project Dashboard
All your projects at a glance with status, domains, and quick actions.
Deployment Logs
Real-time build output with timestamps and error highlighting.
Domain Management
Connect custom domains with automatic SSL provisioning.
Environment Variables
Secure secrets management with encryption at rest.
How it works
Three steps to deploy
Install on your VPS
Single command with your license key. Ubuntu 20.04+ or Debian 11+, 4 GB RAM, a public IP. The installer sets up Docker, Traefik, SSL, and the panel in 5 to 10 minutes.
Open the panel
Visit your domain in the browser, log in with the admin credentials the installer prints, and add a Git token in Settings if your repo is private.
Deploy
Add a project from your GitHub, GitLab or Bitbucket repo and click Deploy, or push to main and let auto-deploy do it.
comparison
Vercel's workflow, your server's bill
Push-to-deploy like Vercel, on a server you control, for a fixed monthly cost.
DIY = possible but requires manual configuration·Comparing with Coolify?
build or buy
Vibe-coding this yourself costs $800+ in tokens.
We build AODE with AI coding agents and measured the tokens. These are lower bounds for reaching the same panel, before anyone maintains it.
What you would be rebuilding
- 120,000
- lines of code
- 258
- API routes
- 65
- database tables
- 99
- test files
How we measured: our Claude Code sessions from 19 to 23 October 2026 used 456 million tokens and added about 35,800 lines of code, roughly 12,700 tokens per line. AODE has 120,000 lines, and about 1.3 lines get written for every line that stays, so reaching it takes over 2 billion tokens: about $800 at Claude Opus 5.5 API prices and about $1,500 at Opus 5 prices. These are lower bounds. Starting from nothing adds design and debugging work we did not count.
Pricing
One price
One-time payment. One production server. No renewal.
Email within 14 days for a full refund
14-day money-back guarantee · refund policy
Free guide
Not ready to buy?
Get the Self-Hosting Starter Guide: pick a VPS, point your domain, deploy your first app. No spam, one email.
One email with the guide. Your address is only used to send it.
Push to main.
AODE does the rest on your own box.
One command to install. About five minutes to your first deploy. The server you already pay for runs all of it.
$49.99 one-time
14-day money-back guarantee